Every job starts with a walk-through at your home.
A long prewar apartment hallway mid-job: canvas drop cloths down the oak floor, the walls a pale gray-green, white doors and casings, a radiator wrapped in clear plastic, daylight from a room at the far end.

Painting inside

A whole apartment, around the building's rules

Whole apartments, co-ops and condos: the building's hours kept, the hall and the elevator protected, a room you can sleep in every night.

  • $70 a painter-hour, plus sales tax
  • Planned in the scope planner
  • The building's hours kept

AI-generated illustration. Not a real home or business.

The building's rules come first

An apartment is painted inside a building that has its own ideas about the work. Most of them are about the parts of the building the painters pass through: when they may arrive and when they must be gone, which elevator they ride, and what goes down on the floor between the elevator and your door.

Those rules are asked for before a date is set, not discovered in the lobby on the first morning. A building that allows work only in a short window gets a shorter day on site, and the walk-through plans the rooms around that day rather than around a longer one the building will not allow.

Many buildings allow work only on weekdays, often from nine to five, and want the service elevator booked and the hall protected. The building's rules win, and a shorter day on site is planned for at the walk-through.

The painters are on site from 8 am to 4 pm, Monday to Friday. Where a building allows work only at other hours, the building's hours win, and a day on site is shorter.

  • The building's working hours win.
  • A room usable every night.
A small steel cup of white paint on a window sill with a foam brush resting across it.AI-generated illustration. Not a real home or business.

Rowan Takahashi-Bell

Office coordinator

Books the walk-throughs and asks each building for its rules.

Rowan asks the managing agent for the building's working hours before anyone asks the painters.

Rowan books the service elevator for the first and the last day of every job.

The picture is a still of the tools, not a portrait.

The elevator, the hall and the certificate

On the first and the last day a painting job is mostly things on the move: drop cloths, rolls of plastic, poles, trays and paint coming in, and all of it going out again. Those are the days the service elevator matters, and the days the hall floor between it and your door is covered.

Two days need the elevator. The office books the service elevator with the super for the first and the last day, when the drop cloths, the plastic and the paint come and go. All we need from you is the super's or the managing agent's telephone number.

A co-op or a condo usually wants paperwork as well, and it wants it before anyone starts. Ask the managing agent early: an agent answers at the agent's own pace, and a start date waits for the answer.

Many co-ops, condos and managed buildings ask a painter for a certificate of insurance naming the building and its managing agent before anyone may start, and an alteration agreement for bigger jobs. A real painter's insurer issues the certificate; ask the managing agent exactly what it must say, a week or more ahead. It is the building's rule, not a law. This demonstration company holds no insurance, so it has no certificate to send.

Living in the apartment while it is painted

Most people stay at home while their apartment is painted, so the order of the rooms is planned around the household. The walk-through settles which room is painted on which day, and where everyone sleeps and cooks on each of them.

At the end of every day the brushes and rollers are washed, the tools go to one corner, and the room you need that night is usable. In a room that is not finished the plastic stays up overnight: taking it down every evening and putting it back every morning is time on the bill, and does nothing for the walls.

In the heating season the radiators are part of the plan too. A radiator is painted cold, because paint brushed onto hot iron skins over before it can level and then blisters as the heat comes and goes. Its valve is closed well before it is painted, or, where the heat is the building's to turn off, the super is asked.

A worked example, and the rate

A prewar walk-up, worked out at the published rate and prices. The household is invented.

A worked example: a planning range

A prewar one-bedroom, trim and doors included A 1930s walk-up in Sunnyside

The sixteen answers behind it
Bedrooms
1
Living or dining rooms
1
Kitchens
1
Bathrooms
1
Hallways and entries
1
Where is it?
Woodside or a neighborhood next to it
How big are the rooms?
About average for New York
How high are the ceilings?
Nine to ten feet, as many prewar buildings have
What are we painting in those rooms?
Walls, ceilings and trim: baseboards, windows and the inside of the closets
Is any of the ceilings textured, sprayed-on or "popcorn"?
No, the ceilings are smooth
And the doors?
The doors of these rooms, both sides and the frames
What shape are the walls in?
Fair: cracks, dents, some flaking at the windows or radiators
And the color?
A new color of about the same depth
How furnished are the rooms?
Furnished, as most homes are
When was the building built?
Before 1960
What kind of home is it?
An apartment in a building with three or more apartments (a co-op or condo included)
  • Paintersby the size of the jobTwo painters
  • Painter-hoursthe work, counted in whole hours61 to 86 painter-hours
  • Working days on sitewith this crew4 to 5½ working days
  • The ratethe same on every working day$70 a painter-hour
  • The time, at the ratethe painter-hours at the rate$4,270.00 to $6,020.00
  • The paint, roughlytwo coats, rounded up to the gallon9 gallons of wall paint and 4 of ceiling paint
  • Paintby the gallon, and the trim enamel by the item$1,063.00
  • Plastic, tape, filler and the restfive rooms together, the lead-safe sheeting included$350.00
  • Before sales taxthe time, the paint and the materials$5,683.00 to $7,433.00
  • Sales tax, 8.875%on the whole bill$504.37 to $659.68
  • The rangea planning range, not an estimate$6,187.37 to $8,092.68
  • Built before 1978: planned lead-safe. It takes longer, and the scope planner counts the time.

The scope planner's answer to these questions, at the published rate and prices. A planning range is not an estimate or a quote, and nothing on this site is an offer of work.

One rate for every painter on every working day, counted in whole painter-hours, with no minimum. Sales tax is added on the whole bill, at 8.875%.
The timeBefore sales tax
One painter for an hour$70
One painter for a day of eight hours on site$560

The same rate every day. No weekend price, no evening price and no busy-season price: one rate, on every working day.

Related services

Plan your painting

Try the scope planner: a crew, painter-hours and working days at the published rate, in about two minutes. Sending it to us books nothing.