Every job starts with a walk-through at your home.
A prewar room the evening before painting: bare walls, books in neat stacks in the middle of the oak floor, more books on a chair by the wall, a double-hung window over a radiator.

Getting ready

The week before the painters come

Bare walls, empty shelves and the building told: most of what makes a painting day go well is done before the first drop cloth goes down.

  • The building asked first
  • The walls bare, the shelves empty

AI-generated illustration. Not a real home or business.

In the week before the work

In the order they are worth doing.

  1. Ask the managing agent what the building needs from a painter, and give us the super's number so the office can book the service elevator.

  2. Take everything off the walls: pictures, mirrors, shelves you want kept, curtains and their rods.

  3. Empty the bookshelves and the surfaces in the rooms we paint, and put the small and breakable things away.

  4. Move what you can from in front of the walls; we move the heavy furniture to the middle and cover it.

  5. Plan where the household sleeps and cooks if a bedroom or the kitchen is painted that day.

The building comes first, because everything else hangs on it: the days the painters can work, the hours they can be there, and whether the elevator is theirs on the first and the last morning.

The walls are cleared because every nail hole is filled and sanded flat with the rest of the prep. Tell the crew lead which hooks go back where they were: a hole that has been filled is a hole you drill again.

Curtains and their rods come down where the windows are painted, because a bracket left on the casing leaves an unpainted square behind it the day it comes off.

We move the furniture to the middle of the room and cover it, and put it back. Books, pictures, curtains and small and breakable things are yours to clear before the first day.

A canvas drop cloth laid flat over an oak floor at the foot of a white baseboard.AI-generated illustration. Not a real home or business.

The building

Asked a week or more ahead, by you or by the office.

Many buildings allow work only on weekdays, often from nine to five, and want the service elevator booked and the hall protected. The building's rules win, and a shorter day on site is planned for at the walk-through.

Two days need the elevator. The office books the service elevator with the super for the first and the last day, when the drop cloths, the plastic and the paint come and go. All we need from you is the super's or the managing agent's telephone number.

Rowan in the office asks the managing agent for the hours. What he needs from you is the managing agent's name, and the building's rules for contractors if it has them in writing.

The household

Where everybody sleeps, cooks and keeps out of the way.

Dry, then hard. Acrylic paint is dry to the touch in about an hour and ready for its next coat in two to four; a room can be used lightly the next day. It hardens fully over the next month, so books on a fresh shelf or a lamp on a fresh sill wait about five days.

So a bedroom painted today is slept in somewhere else tonight, and a kitchen painted today is a day of meals that need no stove. On a longer job, agree the order of the rooms with the crew lead on the first morning, so you know which night the bedroom is out.

An older home

A home built before 1978 is painted lead-safe: plastic sheeting over the floor and across the doorway, the room emptied or its contents sealed, the prep done wet and by hand, no open flame, no heat gun and no power sanding, a HEPA vacuum and a wet wipe at the end, and each windowsill and floor checked against a cleaning card. It takes longer, and the scope planner counts the time. Before the work, the owner, and an adult who lives there if it is someone else, gets the federal pamphlet about it, "Renovate Right".

That is why a room in an older home has to be emptied or have its contents sealed before the first day: the plastic goes down over a bare floor, and nothing stays in the room that the cleaning check would have to cover.

On the painting days

  1. Be there when the painters arrive, or have someone there who can answer for you.

  2. Walk the rooms with the crew lead, and point out anything already damaged.

  3. Keep children and pets out of the rooms being painted, and away from a lead-safe room until it is opened again.

  4. Leave a window open a little where you can; the paint dries faster.

  5. At the end, walk every room with the crew lead before the last stage is paid.

Plan your painting

Try the scope planner: a crew, painter-hours and working days at the published rate, in about two minutes. Sending it to us books nothing.